Mamta Patel

Building Braemore Space – Physically

When our 30-year-old kerosene boiler was declared unrepairable the second winter we were here, we knew we had a big project on our hands. We did not want to go back to fossil fuels so electric with some form of onsite renewable generation were our only options.  We did ask ourselves why bother with our own renewable generation when 99% of Scotland’s electricity is from renewable sources. But having experienced the volatility of electricity prices controlled by world events outside our control, we decided  it was worth the greater security and  cost stability. 

A friend recommended ProTerra Energy Ltd – an Inverness-based company, to help us meet our complex needs. We had not appreciated at the outset the maze of bureaucracy and negotiation it would take with our then electricity provider Scottish Power and the transmission infrastructure provider SSEN to enable us to reconfigure for our own energy supply. Luckily, ProTerra did. Terry Stebbings and his team have helped us through the completion of our ground array of 40 solar panels and two air source heat pumps and eight batteries for energy storage. We love their values statement “to be a fair and ethical renewables company providing a quality engineered solution for our customers” and we can testify to their having more than lived up to this with every employee we have worked with.

A key truth that emerged as we considered ‘going renewable’ was that we would be throwing bad money after good by spending on power generation while our house was poorly insulated. We opted for the heavy pain barrier of moving out of the family residence part of the house – it turned out to be for nearly two years – while every wall was ripped out, insulated and made good again. The difference in internal temperature – even before the heating came back on – was immediate and striking.

If we needed builders to rebuild our house, it made sense to bring forward tentative plans to renovate two old unused garages and create a new business venture – and incur the cost of getting people, equipment and materials to the site once only.

Our first step was to find an architect and we were recommended Reynolds Architecture in Dingwall.  We were impressed by Billy Reynolds’ connection to the area and his take on ‘modern traditional’ design. Through a few iterations we pinned down the design we wanted which respected the Victorian design of Sir John Fowler and sympathetically brought in modern features such as big windows to maximise light alongside mechanical heat wrapping. We also needed two plant rooms housing equipment to manage the renewable generation equipment. Billy and his colleague Marc Bell have been with us through every stage of planning and construction to final sign off. They put out a tender and helped us to assess those who bid.  We rejected those who offered ‘cheaply as possible’ in favour of ‘if we can’t afford it, then do less, but do it right.’ We are proud to be featured as one of the projects on Reynolds Architecture’s website.

We selected Strathpeffer-based family firm Stand Fast Construction to carry out the build, run by brothers Mark and Ryan Grant, with the mainstay of the knowledge and traditional techniques of their father Guy. We came from a Sussex mentality of ‘the customer is always right’ but in the Scottish Highlands, we learned to listen to those who know what works. The project went way over time due to the challenges of sourcing labour, equipment and materials and getting them to our distant site. But we had faith and appreciated that the Grants were as dedicated to good quality and respect for the history of the place as we were. They brought in young apprentices to learn at the hands of experts, who have left memories of music and late morning barbecues. 

Stand Fast has an extensive network of specialist contractors who were brought in as needed,  including brothers Mark and Kris McAllister, aka Highland Plumbing Services, and sparkies Simpson & Moir, run by Ewen Simpson and Stevie Moir.

Critical to the success of any co-working office and venue is the quality of broadband access provided. We turned to SKT Controls & Communications Ltd based in Ullapool. Kim Tunsley and Mick Holmes have worked in step with the builders and electricians to pre-configure ethernet cabling and access points as well as state of the art Sonos ceiling speakers as well as a projector and screen. Whenever a trench was dug and before walls were created or re-instated , Kim and Mick were there to ensure their cables went in. We have heavily relied on their understanding of what we would need as well as their sense of humour.

When we first moved to Braemore, we immediately signed up to Highland Community Broadband (HCB), which was serviced by SKT. We knew that for every customer that signed up, it enabled the company to invest in internet connections to our neighbours in the most remote and inaccessible local areas at a time when other providers were not interested. Without HCB many local residents would have been entirely cut off during the pandemic. But in recent months, more providers have come forward and HCB could not compete with the lower prices offered, sadly winding up in 2026. A new company ScotNet is now providing internet access, where possible via high speed fibre optic networks.  

At Braemore we do not have access to such networks and our initial access, organised by HCB relied, on an EE transmitter for our broadband signal. However, that meant we were dependent on it both for mobile signal and broadband access and when it was taken offline for repairs we lost all contact with the outside world. When this started to happen more frequently and without notice, we had to find another option.  Unfortunately the only realistic current option is Starlink. While the signal this provides is much more reliable and ensures great broadband speeds at Braemore Space, we are actively seeking an alternative and will switch as soon as we can due to our ethical stance against the politics and ambitions of Elon Musk.

Related Stories

Feature Story
Little Local Chefs
Read more
Feature Story
Nature
Creating temperate rainforest: aspens lead the way
Read more
Feature Story
My time at Braemore Space
Read more

Braemore Space, Lochbroom, IV23 2RX